Mounting from the galvanized loading lift table

Loading lift table with railings
Pluggable railings on three sides on the platform from the loading platform.

Loading lifting tables are usually used to load and unload semi-trailers, trucks or flatbed trucks. Sunk in a pit, you can store pallets, lattice boxes or your goods with a classic hand pallet truck. The vehicle drives in front of the stage, you set the desired loading height, fold the loading flaps into the vehicle and can easily load the goods.

Fall protection at the loading lifting table

Galvanized plug-in railings were installed on the lifting table platform. These are necessary so that the operator or the goods cannot fall off the platform when loading. The front side – towards the vehicle – can remain open, as there is no risk of falling here.

In the lower lifting position, the railings can simply be lifted out so that you can unload on the building side with the pallet truck or forklift. Whether the railings are electrically queried or not depends on the official requirements. If a query is necessary, the loading lifting table only lifts when the railings are stuck in the platform.

Pictures of the assembly of the loading lifting table

Lifting table with crane

The delivery of our loading lifting tables,which we assemble, is usually done by crane truck.

We hang the chains from the crane into the included lifting eyelets and lift the lifting table directly from the truck into the concrete pit created by the customer. The lifting eyelets are screwed through the platform into the base frame.

The packaging and the pallet must be removed hanging from the crane, as you can no longer get to it in the pit.

The first hub without power

After the loading lifting table has been placed in the pit, it must be aligned in such a way that there is a uniform circumferential gap towards the pit. This is very easy, as the lifting table is still hanging on the crane.
As soon as you have completed this step, you have to remove the lifting eyelets. Then you hang the chains from the crane truck into the ring eyelets, which are screwed into the lifting table platform. With some lifting table models, you also have to work with straps and lift directly on the platform.
By lifting with the crane, the platform is mechanically pulled upwards. As soon as you have reached the top height, you have to carefully insert the maintenance supports of the lifting table with an aid. Then slowly lower the platform until the lifting table is held in place by the maintenance supports.
Now you can hang the crane and the wiring including commissioning of the loading lifting table can begin.
Loading lift table with loading flaps hot-dip galvanized

Loading lift table with loading flaps

The next step is to dowel the loading platform to the ground and pull the cables and hydraulic hose through the conduit to the desired position.
After connecting, you can already perform test strokes.
Manual loading flaps are removed from the front of the loading lift table. These serve to ensure that you do not have to park completely flush with the vehicle and just in front of the lifting table. As soon as the vehicle is in front of the stage, you fold it onto the loading area and can, for .B, drive over it with a pallet truck.
The loading flaps do not have to be mounted on the loading platform, this is already done in the factory.
Charging flaps can also be operated at the push of a button on request.

External unit and control

For outdoor loading lifting tables, we always recommend positioning the drive and control outside the pit. If there is a flood due to heavy rain, the pit always fills with water first. The external installation ensures that these components do not suffer water damage.

In this project, the customer has chosen a special place for the drive. We had to install the unit at a height of 2m.
For this purpose, we have manufactured a drip tray in such a way that it can be screwed to the wall on site.

The customer did not want a cable duct, so we laid the hydraulic hose and the cables surface-mounted. To ensure that this still looks neat, attention has already been paid to the required length in advance.

No matter whether we carry out the assembly from a loading lifting table or the customer, it is always important to us to provide proper construction information. Good preparation saves you a lot of time later.

Unit from the lifting table in the protected area

Order lifting tables now

If you have any questions, please contact us immediately. We are looking forward to it!